00:00:00,000 [Music] Hi and welcome to the Sunday Lunch Project Manager podcast
for Sunday the 9th of April, 2023. This is your host, Nigel Creaser. And we’ve got part 2 today of my chat with John
00:00:23,200 quickly, the value transformation guy, speak soon. [Music] So as I stand
here now, I’m recording this on Easter. Good Friday, just wait, sunny day in
00:00:45,200 the UK here. And in the last few weeks we’ve been going on. I’ve been
hacking around a little bit with the audio book, trying to get the AI narrated version of the audio book out to a number of different providers, not managed to. My skills with audio is amazing, and
00:01:06,200 it’s easy to tidy up some cleaning up on some, it’s a bit more effort on
that. But it is available on Google Play, which I’ve gone through and
edited properly now, cleaned that all up in the series, should be pretty good as good as the AI can do it. I’ve got a copy also available
00:01:24,200 on Pay Hip, I’m quite happy with you. If you want to grab a copy, whichever you want, really, I think Pay Hip, I might get a bit more money, but if it’s more convenient on Google Play, then jump along
there. So jump along, have a look, see what you think. And if you’re not sure,
00:01:41,200 I’ve got a little extract at the end of the show, so can I listen or just skip
to your next podcast, if not here. What else has been going on? Last
couple of weeks, I’ve had some interesting conversations, speaking to Jen Santos from Brazil, talking about the management
00:01:59,200 of events, big corporate events and similar such things, and the IT
around that, which is really fascinating area. It’s always fun with me
when I go to a conference or exhibition type, I always fancy that, behind the curtains, find out what goes on there. So if you know
00:02:16,200 who they’re saying was me, you’ll find a little bit of a glimpse into some
of the things you need to consider in there and some of the language
that you, I didn’t know, was used, which is really interesting. I also interviewed Bob, Cook, Cook, and Phil Clampett, talking
00:02:38,200 about the servant leadership and beyond the servant leadership, which again was a really fascinating conversation because it is about the
phrase servant leadership, and I’ve always struggled with it, so they kind of helped me with that, which was really good. And then this
00:02:55,200 used our spoke to Laura Chattington, and we were talking about
activating your, or activating people’s careers that’s plateaued. She
runs some master classes and some coaching services, but it’s really,
it’s really useful in Pro actually for anyone who’s out there. I think
00:03:12,200 with sometimes the project manager you can get on the, the grindstone
of deliver the next project, deliver the next project, deliver the next
project, deliver the next project without looking at the next phase, which would be, well, where do I want to take my career? It’s always that
00:03:26,200 next exciting project that we get involved with, rather than us managing
our careers going forward. Those are the main things that have been on
our holiday next week, which I’m really looking forward to, and it can be chilling out in the Welsh coast, and for those who don’t
00:03:45,200 know the way else is by England and not part of England. And yeah, I
think that is really great. So enjoy this conversation with John. We
always go down to the rabbit hole, so I’m going to talk, it’s fascinating, talking about the supply chain and things like that, and
00:04:07,200 how, I’ve not, in the automotive industry, I’ve not been involved in any of that, and typically it’s software with me. So the Cajonia had some
shipping issues with stuff coming from China and they’re on cabling, but the complexities of when you’ve got physical product and physical
00:04:22,200 product being created as part of a project is really fascinating. So I hope you enjoy that, and if you are celebrating a re-store on holiday or
whatever, I hope you have a fantastic time, and we’ll speak again soon. Bye now.
00:04:36,200 I also think requirements change as well, without you knowing. And you
look at the situation we are with CoVid. Most cars aren’t designed well with every single part to be sat in someone’s drive for 18 months without being moved, because of they’re not designed for
00:05:06,200 that. Are they the requirements? No, not usually. No, no, not usually.
There is a lot of people who are not designed for that. I know there is a lot of people who are designed for that.
00:05:20,200 I know there is a lot of people who are designed for that. I know there is
a lot of people who are designed for that. I know there is a lot of people who are designed for that.
00:05:34,200 I know there is a lot of people who are designed for that. I know there is
a lot of people who are designed for that. I know there is a lot of people who are designed for that.
00:05:47,200 I know there is a lot of people who are designed for that. I know there is
a lot of people who are designed for that. I know there is a lot of people who are designed for that.
00:06:01,200 I know there is a lot of people who are designed for that. I know there is
a lot of people who are designed for that. I know there is a lot of people who are designed for that.
00:06:15,200 I know there is a lot of people who are designed for that. I know there is
a lot of people who are designed for that. I know there is a lot of people who are designed for that.
00:06:27,200 When you are thinking about the life cycle of the car, you look at the estimated miles per year. You are probably looking at an envelope. Here is the minimum drive.
00:06:40,200 The lady that buys a grocery store is in church. The typical vehicle. The 00:06:49,200 people who drive a lot, put in a lot of miles.
You figure your part life cycle based on maybe some, some one of
those numbers with some factor of margin. And that will be your design and your testing.
00:07:02,200 So like you said, as our relationship with the car changes, maybe more
public transportation, less miles in general. I think the average is like 15,000 a year usually.
00:07:16,200 I think that’s what the back of the thumb kind of estimated. That’s quite
a standing because if you’ve got that kind of thing in the US and in the UK, we’re much closer.
00:07:28,200 We move much less. I think it’s about 12, used to be the average. It’s 00:07:33,200 quite interesting.
It’s a similar average, still considering the vastness of the two different
places. That’s what I understood it would be probably a few years back. We violate it pretty badly, but my kids in college and we go busy.
00:07:48,200 So I’m kind of, and then like you said, COVID kind of pulled us back
from traveling, you work from home a lot more, and you don’t drive 50 miles one way to a job.
00:07:58,200 That’s kind of helpful. So, and once we selected a supplier, those changes, you can expect that and you got to find a way to manage those things.
00:08:10,200 Well, and that’s going to be important in how we handle the project. No
matter if it’s a supplier based, well, anything that’s external to our
company, obviously if we have, if I can go down to the lab and say can you change the software,
00:08:24,200 and it has no depending consequences on manufacturing, other vehicle
systems, other IT systems, you know, then that’s kind of easy to do. But if you have to tie it in with other systems,
00:08:37,200 as many things do, like you can’t just go get a, you can’t just go write some code for a laptop or a desktop without understanding how that, the consequence of that change in the system is on the cloud
00:08:50,200 and all the other ripple effect of that throughout everything that that
system is going to touch. Yeah, so I think that’s the fundamental project management thing. Yeah, you’re right.
00:09:04,200 I think, when you think about it, you get in that situation as well with
vehicles becoming the more and more integration with computing, with
voice and all those sort of things. Every time I see a new computer out on the TV, I think that’s going to need good Wi-Fi.
00:09:21,200 That’s going to need a good mobile signal for that to be operating. And I
know, round by me, it ain’t great. In certain patches, there’s bits where we can’t play our music.
00:09:30,200 It gets really irritating in the dead zone that we drive through. A few of
those, you kind of look at some of the vehicles and you think, how long
before it could have to be redundancy in that software so that it cannot break without that digital connection.
00:09:46,200 And sort of like airplanes. Yeah, it’s quite interesting. Just thinking about the sort of things with, sort of, supply chain.
00:10:02,200 What would you say of your experience, are the key things that you’ve put in place that kind of saved your ass? You’ve had pieces of work
where you, a little bit of a war story, maybe that sort of thing, but a positive one. You’ve been managing a project and there is a dependency on these supplies and on these supply chains.
00:10:26,200 And you’ve had a problem and how have you got round in? Just give us
a couple of examples of the some of the tools and techniques you used
to do. Well, sometimes we kind of talk about the material acquisition for prototype parts. And you can’t get them from where you think you’re going to get them and then you have to go digging around to other
lower tier suppliers or one way or the other tier suppliers, either the next one down or the next one up to try to acquire it.
00:10:54,200 Or, or something that’s a substitution kind of part that might be
equivalent enough to keep things moving. That’s the substitution one’s
kind of sketchy because when it, in my experience, when they say it’s a
direct substitution, I see integrated circuit or something like that. That
seldom the truth. There’s some little nuance, something that’s going to be different.
00:11:15,200 And it might give you this, but at a cost of something that’s much is too high. So you can’t really do that. If you know when you advance enough, you can buy enough material. I like, for example, I had a customer.
00:11:30,200 They said, I want 50 versions of a B part. And this was probably before
the supply chain got all honked up. And they, and so I worked with the team. We said, okay, they want 50 pieces and we’re going to need some pieces and then we’re going to probably should have a buffer
because they say they want 50, but in our experience, customers, what
they say at that time versus what they say a few months later are going to be two different things.
00:12:01,200 So we’re going to go ahead and order 150 pieces, which is a lot more
than we needed for our testing and for the customer. And it turns out we couldn’t get parts, but we had enough to do our, what we call
design, that verification design, validation to DVT. We had enough to do
our DVT and still build them parts with these extra pieces for their exploration.
00:12:25,200 So in that case, acquiring a little more than you think you’re going to
use without being stupid about it helps. It’s like anything else is like a
schedule thing. I think I can do it in two weeks, but it’s better to have four. Yeah, continuously the word of heresy is people call it.
00:12:47,200 Yes. Yes. Or a little bit of, it’s buffer. It’s planning for a buffer because you know things don’t come off as perfect as you write them down on
paper. And it’s through no fault of anybody’s things vary and that’s a, that’s a fact. The world is full of variation. And even if you have
experience that this is always a week, that doesn’t mean it will always be a week.
00:13:13,200 So, so those, that’s a pretty good one. Looking at other sources. And if
you’re lucky enough, plan a little bit more than you, than you need, you
know, because of yield, because of loss. Because your customer, your
customer is going to come back and say, yeah, I think I need 20 more pieces of that.
00:13:38,200 Those, those are probably some good standbys, I think. I suppose it’s,
it’s, it’s, it’s, both of those are kind of contingency, different, different
drivers contingency out there. Yeah. And it can’t think it’s, it’s good. It’s
one of the things that I don’t know, I don’t know if you’re the same when I’ve had projects where I’ll have a project manager working for me.
00:14:00,200 And they come to me and they give me a project plan and it has no
contingency in. Or if I’ve been asked to put together a plan and say,
well, let’s take more contingency out and what’s the, what’s the happy
path that we can do. And I can’t sit there, just sit there scratching, I
think, but if I hasn’t got contingency in, it isn’t a project schedule schedule. That’s not used with plan.
00:14:18,200 No, it’s not a project, project schedule. It’s just a list of right. Which it’s a
wish. And, and the truth is what my friend of mine, Kim, he calls those
kind of projects death marches, because you know, there’s, there’s no,
there is no way to win this. If you have your, everything stacked in the end without some kind of variation to any way to account for the variation and attack that the past conclusion dates.
00:14:47,200 No, it’s just, you, you have no safety net at all. There’s no wiggle room.
There is no wiggle room. Yeah, so it is no wiggle room. Yeah, it’s going to be, you know what? Yeah, go ahead and do that. We’re going to be
late. I’ll tell you right now, you’re out. We’re not going to be on time.
00:15:10,200 Hey, we’re probably going to be over budget too, just just because, you
know, because, well, because you’d be thrashing people with overtime, trying to make this. So you’re contingency becomes people’s weekends, people’s evenings, holidays, paying them extra and all of
that. And so you’re paying them more so it’s costing you more and you
are not helping your people out. I mean, I, I don’t know about you, but
some of the most irritated times I’ve been in a project is when I’ve had to work over the holiday.
00:15:36,200 And I knew six to eight months before, maybe even nine that there would have been a way to avoid it. Yeah. Or, or we should have just
started replanning so that that was not going to be the eventuality, you
know, you tell the executives here’s how this is going to go. And they’re
like, no, that’s not going to happen. Yeah. OK. Well, it’s the Christmas holidays whenever I see a schedule and people schedule together and it’s got work happening for the three weeks leading up to an end
Christmas. It’s kind of no assume productivity is zero in those three weeks.
00:16:08,200 At least not 100% yeah, even not 100% I was like, well, I just say zero
and then that gives you continuous anyway. I just got I assume people
are not going to be as focused. People aren’t going to be as as on it as
they were the three weeks before that. Right. And and rightfully so if
they have vacation time, what are you going to tell them no? And then
then beginning of the year you’re going to tell them no also you’re going to tell them you can’t carry over your vacation time.
00:16:36,200 Yeah, and you can’t take it next year because of we have no carryover
policy and I need you on another project. So none of that is helpful.
Yeah, it doesn’t it’s it. I think that the difficulty I find is sometimes people
it is once you sit there and go, well, we might be able to we should do
this should do that. It’s kind of well should the great word. And actually
it is it isn’t that we we should be able to make it and we should be able to get people in and we should be able to do that.
00:17:01,200 It’s kind of look at reality look at what the real situation what the real human beings that we’re working with and dealing with art and plan
accordingly. And that that will save a lot of challenges for everybody. I
remember having a project where the other side they were desperate to
get it in. It was the 22nd of February was the date they desperately wanted. I remember this vividly because we spent many weeks and met.
00:17:28,200 But good relation good solid relationship with the customer. I was telling them I will not make the 20. Sorry, you sorry you want know they wanted the 14th and I told them I could make the 22nd because we’d
looked at it. We knew the stuff that was going on. You the kind of risk and I knew there was some stuff we weren’t sure about. This was
physical kind of stuff in content centers and upgrades and things I’m like. Yeah. I can in as close as I can guarantee a date.
00:17:54,200 The 22nd I could guarantee the 14th I want even sign up to that but we
will try to bring it forward. Yeah. And that was the way I went with that
and I and it’s one of those ones because I is one of the times when I
was sensible enough to hold my guns and not get persuaded that yeah,
yeah, yeah, we’ll be right. It was kind of no definitely not because seems like only a week right. Yeah, that’s not how that works.
00:18:20,200 Exactly. Yeah. And and and actually I think we could have done the 14th but then something from my memory season right something happened
minor that would have meant it wouldn’t have been on the 14th and it
would have had to have been in the middle of the week. But therefore
we couldn’t therefore we had to do it the following week. So it was that
kind of. Oh, you know, I mean it was a kind of it’s around 13th or 14th. It
was right. That sort of thing where the team you could have to do it a weekend.
00:18:45,200 You couldn’t do it in working days and that meant one minor thing
jumped in a month. But we knew it nearly there. Yeah. And it was just a
just actually small piece of work that as well. It’s just the final throws of
it and it politically they wanted to get the date there politically they wanted to say that specific date and it was kind of.
00:19:04,200 Sometimes you got to take that as a project manager. I think some with
these sort of things of can building in your contingency. And if you’ve
got something as you’ve talked about here where you’ve got a product where you’ve got say 50 of these products you’ve got to go in your budget. We’re going to buy 150 right great. Why you buy 150? They only need 50 in the requirements document. Well that’s for this.
00:19:23,200 But you kind of you pay for it then. Yeah. Or you pay for it later. Yeah.
But you pay for it and you think is when you pay for it upfront. What do
you say? I’m going to go through a little grief of giving the bad news to customers say you know we said we thought might be doing it in six months. We can only do it. We’ve got we need another two weeks or another month to do it.
00:19:48,200 I know you’re not happy. There’s have all the arguments and the
demonstration six months ahead. Get past that and get them delivered.
Yeah. The cost of doing that compared to the cost of trying to bring in
something a month that you know you can’t do. The cost of relationship
the cost of staff the cost of money cost. Yeah. It’s it’s it’s being able to explain to people you pay for it now.
00:20:13,200 You pay for it later. Yeah. And actually if you pay for it now agree now
you may have time to avoid it. Yeah. Because you’ve got that you’ve got
that mindset of right we’ve now got some space to avoid. Yeah. Yeah. That contingency. Let’s work out how we can avoid that contingency.
Whereas when you’re got delivered to a day all you’re focusing on is
getting to that day and and you know that’s already under pressure as well.
00:20:42,200 Yeah. And then then things in my experience when you have delivered
that date and it had that date is singular like that. That’s when you see I
don’t know if this is a self preservation thing or if it’s just a optimistic the rose colored glasses picking through what you see an estimate of a work package that says yeah we’re done. We’re through with testing. Maybe we haven’t even started. We have seen no defect reports that were okay. You know but the fact is you’re not okay.
00:21:16,200 You had even begun testing so you start you start judging signs that
you might be on the right path that carry picking right it’s confirmation
bias. I see something that looks like it affirms what I want to have
happen. So I’m just going to go with it and then you find out after you
either make the date and you deliver crap. Something that’s not great to the customer or you miss the date you have to go to the customer at
one hour before it’s delivery and say yeah I’m going to need another
month and and in their mind if you tell me that and I’m your customer I’m like what the hell did this just pop up.
00:21:57,200 How could this pop up? Yeah today today you know you need a month what happened two weeks ago or maybe a month back. Yeah exactly. You’re watermelon projects and they yes yes that’s what they are
they’re green on the outside but if you take a little knife and scratch that
thing. Ouch. I’m glowing around. I can’t remember where I heard that
phrase I just thought it was fantastic it really summarized projects before they’re in different places.
00:22:26,200 I think the thing is you took talks from there kind of made me think of that obviously your verification and testing sort of background and
expertise as well is. That’s that point isn’t it where you have phases of
testing at the back end of your project and what ends up happening is
you go in and the car we got a problem in problem in design. Are you ready to redesign? Okay we did a bit of time.
00:22:51,200 So we’ve slipped a couple of weeks. Oh sorry we can get the car and
we can press testing and then you get into dev and you kind of get a
problem and you get a go around the car. But why don’t we parallel run
that test with that test and it okay so you’ll be okay on that and then you
kind of go and those parallel run tests you’ve dealt something that turns
a bit so. And then okay so we’re going to have to bring the final testing and overlap and you end up doing all of your phases of testing.
00:23:17,200 At the same time with the same people on the same environments and
yeah probably the only one set of hardware which is not how it testing
is supposed to work is supposed to be. And you do it throughout so you
learn as you go and you start out you don’t get this big. Of false defects reported as you reach the end because you’ve had 10% here 8% here 20% here.
00:23:41,200 A defects reported along the line as you’ve done as you’ve iterated.
Yeah exactly I saw somebody drew a great picture of this. They had a
straight line and they say here’s the development and here’s the testing
time was two line segments right and they said in the next graphic had
the development going a lot further and then it had the testing line a zigzag line like it been smashed crashed and they’re doing all that
same length of line segment is just accordion up in a smaller space.
Yeah. Yeah I see. Yeah that happens is pretty common and the project manager just got to be aware of those things because.
00:24:18,200 One if you’re not able to sell tell people that you know the software is
late or the hardware is late and we can’t start the testing and the testing
has got to go through this window of time and these things if you’re not able to say those deliver those hard truths and manage expectations
then you’re probably not in the right job. The project manager has got to
be able to listen to bad news and not see it as bad news it’s just news
and they got to be able to find a way around it if possible and if not they
got to be able to convey that outward to everybody that needs to hear
that. Hey here’s a good book you might want to check out it’s called double speak.
00:24:59,200 It brings about and I think it’s a go rat wrote something about mitigated
speech that’s another word for it but that book is pretty interesting
because it describes these things people do that they were they were things so softly. That the sense of urgency is gone from it and
sometimes it’s out of a fear of offending or hurting somebody’s feelings
and sometimes itself preservation I don’t know what else it could be but.
You know and these things are not going to be all that helpful for a
project manager you should be able to speak very clear and it’s already difficult enough to communicate and have people walk away understanding what you’ve said.
00:25:48,200 Yeah I think it is I think we’ve all been caught at times where you’ll be sitting there writing your status report and you’re there thinking someone’s told me we’ve got a problem but I think they’re going to solve it next week. Do I do I do I escalate now and have a load of people running around and get too much help from senior management
which will slow the thing down and stop the person getting it done next week. Or at least give me a lot more reports to write.
00:26:20,200 Because I’ve seen it where in and after he’ll other people say it’s quite
often you will get a situation where you’ll have someone to deliver. And you you go red but what you don’t get is help what you get is extra
reporting. Yeah and I think it’s it’s a as an as an organ as a profession.
00:26:41,200 I think we’re on us to be able to actually change that little bit say right when a project manager has a problem with a project. They need help
not reporting so they need someone to go in there sit with them help
them solve the problem bringing it the red team quite often come into
work out who’s to blame or what the excuses might be. Yeah not always
to come in and help solve the problem and give extra knowledge hands in experience and.
00:27:09,200 It’s it’s difficult it’s a difficult I can understand especially someone who’s
a junior project manager trying to divert time cost quality. Yeah just a
grown. I don’t want to raise this yet we can work we can work it out we
can get it done as I’m supposed I’m not to bring problems I’m going to bring solutions.
00:27:27,200 Yeah that’s that’s not yeah what you’re saying is true except for that it
should not be true that you don’t bring your problems. In fact for me I
one of the very first things you should have in your project plan is an
escalation path and that includes escalation internally and escalation at
your at your supply base. We got your supply base depending on things
and there’s got to be a way of telegraphing a punch without actually saying I need to escalate this right.
00:27:54,200 There’s that middle stage you don’t go from green to claiming red you
go from green to okay we have a challenge actually we have something
that looks like it’s going to cause us problems. But we are uncertain if it
will or not it’s not good for sure and we need a little bit more time to
ascertain the impact. If any and that’s an interim step which you should
have that in your back pocket maybe you to start telegraphing this to your escalation path saying yeah something’s.
00:28:29,200 We may not be making this because of these other reasons the
software is late or the hardware is late or. It’s easy to do a heads up
isn’t it and that’s the thing is actually I’ve done it before it’s where we’ve
had situations when someone’s coming through I’ll do a heads up to my
management chain going. Head up don’t think it’s going to be a problem
think we’ll solve it but just in case this is the huge and open be aware of and we may need to know up next week next day whatever.
00:28:58,200 And typically and then if we do need that help it’s kind of that conversation that doors already open the conversations there you
haven’t. Incorrectly redeployed loads of the organization’s resources to
solve a problem you haven’t got yet you also haven’t hidden the fact from someone right so they’re not surprised. No week later when you come to them say yeah we need their score. But they we’ve later
they’ve already been thinking about that heads up going well if that’s a problem well I’ve got.
00:29:31,200 Jeff over here and Mary over here we could bring them into that and help them if it becomes a problem yeah and and you know they’ve got
the time to do that planning and thinking rather than it’s a problem now
what’s the what’s the solution to do that that’s right. I think it’s a double
speak thing as you say it sometimes being direct and same we’ve got a
problem is it’s it’s hard to do but it’s it’s here’s a yeah. Otherwise you end up the other way you end up doing it and I think you’d love it actually there’s a podcast it’s the PM podcast and it’s Seth.
00:30:06,200 I’ll for this name. For about this name it’s not Seth it’s something mixed him up some else. This is the PM podcast anyway and he did an April fools podcast on blame management as part of the project management tool. And it is fairies but 20 minutes long it’s about identifying when there’s a problem who to blame or what potential
candidates for blame how are you at what we put in place to make sure
it looks like they’re the ones to blame for the project failure and it and
actually if it was written in the PM block you’d read it and you’d be
thinking and it’s structured way to do so well done you think it’s a
legitimate thing would yeah yeah it’s the same as he talks about the same kind of flows as you would be risk management change manager it’s government.
00:30:56,200 All that’s up there and it’s just I haven’t listened to it for a few years I
need to listen to it again because I’ve actually when you listen to it and if you put your hand on your heart you’ve heard people you’ve seen
people doing it and you’ve I’m sure if you haven’t done it yourself you’ve
had yourself thinking it before there is someone. Is that the answer I
transfer this to somebody else because this is going to be crap yeah
yeah you sit in their light light hand solo on in style was going it’s not my
fault it’s not my fault is not that is it’s brilliant it’s a really good PM
podcast it been going I don’t know why I’ve got a blank on his name.
Cornelius Fesiner Cornelius Fesiner for some reason there was mixing
up with Seth Schostak who is a scientist at the set the institute is on another podcast listen cool.
00:31:54,200 And the Cornelius he’s he’s I think he’s probably one of the PM
podcasts that’s been around for a lot longer than I’ve done. I’ll send you something I wrote on hope project management they you might find a
little humorous to say we’re going to pray so the thing I guess yeah
most people really get a chuckle out of it because in their like yeah
that’s that’s kind of cool yeah that’s the way it is. Most humor comes from a little bit of realism doesn’t it yeah.
00:32:25,200 So just I’m just think we’re just just ticking up coming up to the hour sort
of time from when we started recording. What if you were going to talk to a project manager new project manager even experienced project
managers looking to having to use a supply chain of some description
for their particular project. What I think I can guess some of the things
we probably talked about but what what things maybe we haven’t talked
about would you talk about maybe the top three things that you think
about what they would need to have in place to help them get the best experience of having a deal with the supply chain.
00:33:09,200 I’d say the first one is you need to be included with the procurement
people throughout the selection process. The second is identify metrics
and milestones throughout your project and make sure that you have a common understanding of that with your supplier when you say I need a C part on this date. Make sure they understand you and they understand what AC level part looks like.
00:33:39,200 Yeah, you know because that or whatever whatever you call that level apart make sure that they see a YouTube equality. Yeah, I’m talking
about like the it would be a part that’s between a pure prototype part
and a part that’s off of production. For example, a C level part would be the maybe the PC boards are off of production processes or maybe they’re somewhat production processing.
00:34:09,200 The housing would be off of some kind of a non production related tool. Yeah, it might be a hard a soft tool that mimics the hard tool or
something like that. So so whatever your qualifications are, the real
important thing is whatever your company thinks that part should look like.
00:34:32,200 Make sure you talk with your part of the supplier discussions saying this
is what this part looks like, which means yeah, probably going to have engineers and quality assurance engineers in there as well talking
about it. But you need to be part of those discussions if nothing more than to understand that we all have a common view of what we mean
when we say this. Right, and things like that that are key to your project throughout the supplier involvement with the with the development effort.
00:35:00,200 And then you you seriously need to have some sort of checklist of the
requirements that you’re expecting that customer. So that’s assuming
that supplier to deliver to and then you should have some sort of action
in place to confirm or refute that list of things. Now often it looks like a set of requirements, right?
00:35:22,200 It could be a little requirements document or a set of different. Here’s a hardware requirement. Here’s a software requirements document. Here’s some manufacturing or here’s a testing thing.
00:35:32,200 Something those artifacts you should have a list of things that are in the
contract. Now a lot of that’s going to be from procurement. But my my
experiences the procurement folks kind of missed some of that the one
they’re mostly concerned with is is the contract closed to some degree,
right? Maybe their artifacts have been delivered and it looks like the
manufacturing line works. So we’re done. That’s not necessarily true.
00:35:58,200 In order to close the project out the project management needs to know more than just the procurement details are closed out. I need to
understand do I have all the software pieces that are supposed to be or
all the hardware pieces in here are supporting documentation if that
was expected. What about aftermarket tools to test this thing if it fails in
the field and I need to run some I need to run some tests you know I’ll
have the part taken from the dealer and shipped to this test facility to check out the company.
00:36:27,200 And it truly was a failed part is that part of the contractual obligations
that I need to I need to us to make sure are are accounted for. So that’s
that’s going to be another one that that checklist of the how do I know I’m done. Yeah, so those are going to be the big things I think.
00:36:50,200 Yeah, pretty not super. So thank you very much John for coming on and
having a chat with us again. It’s been a fascinating digging into it. A realm that is a little bit alien to me.
00:37:04,200 Although not as alien as I thought it was when I kind of but there is still some there are there are more commonalities than I thought there
would be. Yeah, on some things to done. If people want to hold you talk more find out something grab a new book or anything what what’s the
best way to get to touch with you when you can email me at john jo n dot quickly at value transform dot com.
00:37:28,200 And I’d appreciate a follow of value transformation on LinkedIn.
Anybody that listens to this you can ping me there to cool brilliant all
right and job in which case. Thank you very much for being on the show and have a fantastic rest of your evening.
00:37:47,200 Thank you Nigel and you also I’ll try my out. Well, I hope you enjoyed
that and as I mentioned earlier on if you carry on listening to the end
today you’ll hear a little exit of the intro from my book. I’m going to
share with you a little bit of the content that I’m going to share with you.
00:38:15,200 I’m going to share with you a little bit of the content that I’m going to
share with you. And I’m going to share with you a little bit of the content
that I’m going to share with you. And I’m going to share with you a little bit of the content that I’m going to share with you.
00:38:31,200 So this is my final wrap up every week you’re going to hear this you’re
going to get bored of it. But you can always click next podcast if so. If
you have enjoyed it if you listen to this podcast at the end of this show and you think that was great.
00:38:55,200 I’d love to be able to help Nigel. There are loads of ways you can do it.
The first and obvious way is to share the podcast. Send it out to people.
If you know colleagues or friends who’ve benefit from it, think they’d enjoy it, just send them the link.
00:39:14,200 Grab one of the links. Send or send them to
www.NigelCreaser.com/podcasts And that will push them over to a link
tree link and it’s got all of the different ways they can consume the
podcast. If you are feeling generous and have a big bag of cash, you could grab a copy of one of my books.
00:39:44,200 They’re available in all the usual places and print and digital. Again,
jump on the website www.NigelCreaser.com/shop And that will give you
a list of all the different ways that you can contribute and grab copies of the book.
00:40:01,200 Also got links to all my guests’ books on there as well where I get a little
bit of a kickback from them. If you are of a sporting mind, I have a number through doing some of my judo and running antics. I’ve
managed to secure a few affiliate links and affiliates there as well.
00:40:25,200 So in there, somewhere in the sponsors page, there’s links to those as
well. So clicking on to those and grabbing your, if you’re with it, if you’re looking to get super fit, then that would be fabulous as well.
00:40:38,200 I get a little kickback from those. I have a Patreon account. It’s 00:40:47,200 patreon.com/sundaylunchpm.
So again, you can ping something in there by me or coffee or whatever.
And finally, obviously the most important is coming back. Coming back, listen again, because the more of you that come back, the more visibility I get
00:41:03,200 because there’s more times that you’re downloading and all the SEO
works and things like that. So yeah, that’s it. So if you can help me out, I would be much appreciated.
00:41:14,200 If you can, don’t worry about it. Thank you very much, Chisna. Bye. 00:41:19,200
Well, it’s goodbye from me, Nigel Creaser. And it’s goodbye from him, the Sunday lunch pm. Goodbye.
00:41:28,200 [Music] Introduction. Hi and welcome to Project Manager Productivity 00:41:39,200 Hacks.
Why write another book on Productivity Hacks? Are there not enough of them already? The trigger was my interview with Sarah M. Hobern for my podcast, The Sunday Lunch Project Manager Podcast.
00:41:51,200 Plug, plug. Find out more at www.nigelcriser.com/seraM. Hobern. We 00:42:02,200 talked about improving productivity for project managers.
And during the conversation, I recalled that a while ago I started a blog post in which I planned to share some ideas that I have used in my
career to improve my productivity and get out of the office that little bit earlier. Over the years, I have shared these with others.
00:42:18,200 And almost every time I received a positive and enthusiastic response. Having rekindled the idea, I sat down and noted 11 hacks, tips, shortcuts, whatever you want to call them that I have used over the years. Why 11?
00:42:32,200 Well, it’s one more than 10. This book goes up to 11, one for the spinal tap fans. I see productivity as remarkably similar to an exercise program.
00:42:43,200 We all start off with good intentions and some of the changes work
great for us and others don’t. Some changes stick and become part of
our daily life, whereas others are just a real chore. Even the ones we
found that work well for us and are straightforward to implement can, under certain circumstances, end up being dropped by us.
00:43:02,200 Sometimes this happens consciously and sometimes little by little over
time. Whether building healthier habits or improving our productivity, it’s not just a case of making the changes. And we are done.
00:43:14,200 It takes repeated work. If you find them hard to implement, then they
may not be for you in your current situation. If you start using them and end up letting them drift, then start again.
00:43:26,200 Improving our productivity is something many of us strive to achieve,
aiming for some kind of efficiency nivana. Let me tell you it ain’t gonna happen. Perfection is a myth. Give yourself a break.
00:43:38,200 It’s a bit like yoga, you can’t win at yoga, no matter how bendy you get,
you can always be bendier. That’s the same with personal productivity,
you can’t win at productivity, you can always be productivity. Ed, is that a word?
00:43:53,200 I have not always been able to apply these hacks successfully, but that
is not a reflection of the hacks themselves. It is more about my ability to
stick with them even though I know they work. One last point, as with
your fitness regime trying to make loads of changes at once can spell disaster.
00:44:10,200 I recommend that once you have a read of these hacks, choose one
that excites you, maybe not excites but seems to resonate, and have a
go at it. Once it is second nature to you, move on to the next one that
spoke to you. If you find that the first one was not for you, then bin it.
00:44:26,200 Choose another and try that one out, then rinse and repeat. So on with the hacks. [ Silence ]